The IDNR comment period is ending for the revised draft of Collection of Air Permits (CAP) template.  The new proposed construction permit would assign a permit number to each emission point but consolidate requirements into one document.  Based on substantial initial comments, IDNR updated the draft template and has accepted comments on the revised design.  See the files posted on the Stakeholder Involvement website.